27.8.2008
The information on failure which has occured on K.Marx mine of the State enterprise "Ordzhonikidzeuhol’"
Situation at 8.00 a.m., August 27. Preparational works for cage hanging in trunk №2. 6 cubic metres of mine mass is given up the surface from horizon 750 m.
Pumping of the horizon 500 m., 750 m., 875 m., 1000 m. work in usual regime.
On 26th of August at 10.00., 15.00 and 19.00 p.m. there were held working group meetings of consideration of the questions connected with carrying out of search-emergency works on mine.
On 27th of August the next meeting of working group will be held.
Search and rescue works and works on liquidation of failure on mine continue.